Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Brand: TRANCHART
Application: Indoor, Outdoor
Warranty Period: 1 Year
Certification: Ce, Rohs
Transportation: Ocean,Land
Place of Origin: Changzhou
Port: Shanghai,Ningbo
Payment Type: L/C,T/T
Case of Intelligent Integrated Substation 2000kw
With the increasing of load and load density, the voltage level and capacity of the substation are increasing, not only the single capacity of the Transformer is increasing, the number of the transformer is also increasing, and the demand for reliability of the power supply is getting higher and higher. At the same time, due to the requirements of the environment, substation site selection, line corridor is more and more difficult, so the substation is reliable and as far as possible to occupy the ground. Trend is: first, to simplify the voltage level, with high voltage deep into load centers, the second is in the aspect of equipment to the high reliability and miniaturization, intelligent direction, and strive to the case of moistureproof, fire prevention performance and to meet the requirements of the environment temperature changes, and extend the maintenance cycle of equipment as far as possible and reduce the maintenance workload, meet the needs of maintenance free.
Substation is a power facility in the power system that transforms voltage, receives and distributes power, controls the flow direction of power and adjusts the voltage, In order to ensure that the power system and the power supply department continuously supply power to the users, the high and Low Voltage Switchgear and transformer, as the main equipment for the operation of the power system substation, are very important for the safe and stable operation of the power system.
2000KW transformer room configuration NO. project type specification unit quantity high voltage system 1 H1 Incoming cabinet Metal-clab Withdrawable Switchgear
KYN28-12 unit 1 2 H2 metering cabinet set 1 3 H3 PT & arrester cabinet set 1 4 H4 outlet cabinet set 1 5 DC screen 20AH/DC110V 1 6 Primary analog screen 1 low voltage system 1000KVA 1 1L1 Incoming cabinet 0.4kV MNS 1 2 1LV2 Generator receiving cabinet 0.4kV MNS 1 3 1LV3~4 Capacitor cabinet
300KVAR 0.4kV MNS 2 4 1LV5~9 outlet cabinet 0.4kV MNS 5 transformers 2000KVA 1 Dry-type Transformer SCB11-2000KVA,all copper 1 Other Expense 5 Transformer and secondary main connection Includes copper bar, fittings Intensive busbar slot Including busbar, end, lifting bracket and other installation accessories power cable Includes control cable,LV Power Cables,hv power cable Power Supervisory System Design and installation system (additional charge) 1 cost of design 2 Cost of installation Including power test fee (excluding civil engineering and basic channel steel, electrostatic floor) 3 Simulation chart 4 Safety tool Note: this configuration is only the basic configuration, the specific configuration should be customized according to the design drawings and customer requirements. Welcome online consultation and discussion.
Product Categories : Solution > Power Distribution Engineering Solution
Mr. simon.tang
Tel:
86-519-85131880
Fax:
86-519-85131880
E-mail:
Related Products List
Mobile Site
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.