Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Model No.: 2500KW
Brand: TRANCHART
Application: Indoor, Outdoor
Warranty Period: 1 Year, 2 Years
Certification: Ce, Rohs
Transportation: Ocean,Land
Place of Origin: Changzhou
Port: Shanghai,Ningbo
Payment Type: L/C,T/T
Case of Intelligent Integrated Substation 2500kw
With the increasing of load and load density, the voltage level and capacity of the substation are increasing, not only the single capacity of the Transformer is increasing, the number of the transformer is also increasing, and the demand for reliability of the power supply is getting higher and higher. At the same time, due to the requirements of the environment, substation site selection, line corridor is more and more difficult, so the substation is reliable and as far as possible to occupy the ground. Trend is: first, to simplify the voltage level, with high voltage deep into load centers, the second is in the aspect of equipment to the high reliability and miniaturization, intelligent direction, and strive to the case of moistureproof, fire prevention performance and to meet the requirements of the environment temperature changes, and extend the maintenance cycle of equipment as far as possible and reduce the maintenance workload, meet the needs of maintenance free.
2500KW substation configuration (high and Low Voltage Switchgear all use Siemens electric) NO. project type specification unit quantity high voltage system 1 2HP1 Incoming cabinet Air insulated
Metal-clab Withdrawable Switchgear
NXAIR S-12 unit 1 2 2HP2 metering cabinet unit 1 3 2HP3 PT & arrester cabinet unit 1 4 2HP4 outlet cabinet unit 1 5 DC screen set 1 6 Primary analog screen set 1 low voltage system 2500KVA 1 2LP1 Incoming cabinet SIVACON 8PT unit 1 2 2LP2,2LP3 Capacitor cabinet SIVACON 8PT unit 2 3 2LP4~8 outlet cabinet SIVACON 8PT unit 5 transformers 2500KVA 1 Dry-type Transformer SCB13-2500KVA,all copper, unit 1 Other Expense 5 Transformer and secondary main connection Includes copper bar, fittings Busbar slot Including busbar, end, lifting bracket and other installation accessories power cable Includes control cable,LV Power Cables,hv power cable Power Supervisory System Design and installation system (additional charge) 1 cost of design 2 Cost of installation Including power test fee (excluding civil engineering and basic channel steel, electrostatic floor) 3 Simulation chart 4 Safety tool Note: this configuration is only the basic configuration, the specific configuration should be customized according to the design drawings and customer requirements. Welcome online consultation and discussion.
Product Categories : Solution > Power Distribution Engineering Solution
Mr. simon.tang
Tel:
86-519-85131880
Fax:
86-519-85131880
E-mail:
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.